PCI P2PE Assessment

Assess a P2PE Solution, component, Merchant-Managed Solution or application against PCI P2PE v3.2 in Kliper: record the report details and the findings of its P-ROV, complete the P-AOV, and export both in Word or PDF.

Updated View as Markdown

Kliper runs a PCI P2PE v3.2 assessment in the same requirement editor as a PCI DSS ROC. Each assessment reports on one P2PE Report on Validation (P-ROV): you record its report details, a finding and the assessor’s responses for each requirement, and the answers its Attestation of Validation (P-AOV) asks for, then export both.

How a P2PE assessment runs

Create the assessment

Pick PCI P2PE 3.2 and the P-ROV it reports on.

Record the report details

Contacts and dates, the product and its component providers, scope, diagrams, facilities, documents, interviewees and samples.

Assess each requirement

For each requirement, choose a finding and write the assessor’s response to each reporting instruction of each testing procedure.

Explain the N/A requirements and complete the P-AOV

List each N/A requirement in 4.2 with its reason, then answer what the P-AOV asks beyond the report.

Export

Download the P-ROV and the P-AOV in Word or PDF, after the export checks.

Create a P2PE assessment

In Quick create, pick PCI P2PE 3.2: a Report on Validation field appears, where you choose the P-ROV. In the full wizard, select PCI P2PE and version 3.2 on the Framework step, then choose the Report on Validation on Scope & visibility. More options carries both from Quick create to the full wizard, and back. A solution provider that needs several P-ROVs (the Solution’s and an EMS, for instance) creates one assessment for each in the same engagement. The P-ROV cannot be changed after creation. See Creating an Assessment for the rest of the flow.

Report on Validation Covers Requirements Testing procedures
P2PE Solution Domain 3 19 36
Encryption Management Services Domains 1 and 5 175 322
Decryption Management Services Domains 4 and 5 236 467
Key Management Services Domain 5 281 507
Merchant-Managed Solution Domain 3 and Appendix A 34 65
P2PE Application Domain 2 62 113

Each P-ROV keeps its template’s own wording: the EMS and the DMS word some of Domain 5’s requirements differently.

What the assessment contains

Requirements are shown with the numbers the P-ROV prints: 1A-1.1, 6-1.1, 5I-1.1, MM-A-2.1. Each section has its own page under its domain (1A under Domain 1), and Domain 5 is paged by Control Objective, its requirements grouped as Requirement 6, Requirement 7. In the EMS and KMS P-ROVs, each testing procedure says which component types it applies to.

The report details

Section 1 is the same in every P-ROV; sections 2 and 3 are each template’s own.

Item What you record
1.1 to 1.4 The assessed entity, the P2PE Assessor company and lead assessor, the internal QA affirmation and the QA reviewer, any additional assessors, the dates, the services disclosed, the v3.2 affirmation
2.1 The product: its name, whether it is listed and its reference; for a component P-ROV, whether it is submitted with a Solution’s assessment or as a component, and its type; for an application, the type of assessment it belongs to
2.2 onwards The validated component providers, third parties, applications, POI devices, SCDs, additional encryption implementations and the compliance summary, as the template asks
Section 3 Scope, the diagrams, facilities, documents, interviewees, sampled devices, the key matrix and, where the template asks, test transactions and sample sets
4.1 The Summary of Findings, each of the template’s rows read from the findings
4.2 Each requirement determined N/A and why. Add the requirements from the findings lists them

A question asked only on another answer (a listing reference after Yes, a component’s type once 2.1 says it is assessed as one) appears, and counts towards progress, only then. On a Decryption Management Services P-ROV, 4D asks whether the environment is a hybrid decryption environment and 4E-1 whether the vendor is a P2PE Component Provider: when not, the template leaves 4D and 5H, or 4E-1.1 to 4E-1.2.b, blank or N/A.

Record a finding

For each requirement, choose a finding:

Finding When
In Place The requirement is met
N/A The requirement, through testing and review, does not apply to the product
Not in Place The requirement is not met

P2PE has no Not Tested result and allows no compensating control. Then write the assessor’s response to each reporting instruction: what was examined, observed or interviewed, and what it showed. An N/A finding is reported the same way, saying how it was determined not to apply, and is listed in 4.2.

A row of the Summary of Findings reads Not in Place when a requirement under it is, N/A when all are, and In Place otherwise: a mix of In Place and N/A.

The P-AOV’s answers

The Attestation of Validation pages ask only what the report does not give. Its form follows the P-ROV:

P-ROV P-AOV
Solution, a component assessed as one, a separately-listed application The P2PE Product P-AOV (v3.1)
Merchant-Managed Solution The P2PE Merchant-Managed Solution AOV (v3.0)
An application validated as part of a Merchant-Managed Solution Its own AOV (v3.0)
A component submitted with a Solution’s assessment, an application assessed only for a Solution None of its own: the Solution’s covers it
Page What you record
Submission or validation type Administrative Change, Delta Change, Annual Revalidation or Full Assessment, as the form offers
Vendor and assessor The parties and their addresses. Fill from 1.1 copies the report’s contacts
Parts 3b to 3e (Merchant-Managed Solution) The POI devices, the applications, the HSMs and the listed component providers

The product, its type and its listing come from 2.1; an MMS application’s devices from its 2.5. The attestations, their dates and the signatures are made on the exported document.

Export the P-ROV and the P-AOV

Click Export in the assessment header, or in the top bar’s Actions menu. Choose the Report on Validation, the Attestation of Validation or both, in PDF or Word. The P-AOV card is unavailable when 2.1 says the P-ROV has none of its own. An unfinished PDF can carry the DRAFT watermark.

Before the file is made, Kliper runs the export checks. Blockers are what the P-ROV requires; warnings are worth a second look. Export anyway produces the file regardless.

Check Severity
A requirement with a finding whose reporting instructions are not all answered (“N/A” or “see …” alone counts as no response unless it cites Doc-1 or Int-1, and never for an N/A) Blocker
A Not Tested finding or a compensating control stored before, which the P-ROV has none of Blocker
An N/A requirement not explained in 4.2 (a row may name a requirement, its group, a section or Requirement 6) Blocker
4.2 listing a requirement the findings do not give N/A Warning
4.2 naming a number the P-ROV has no requirement under (a typo, another P-ROV’s) Warning
A requirement Not in Place: the product is not validated Warning
A DMS requirement reported where 4D or 4E-1 leaves it out Warning
A diagram item with no diagram Warning
A response that repeats its testing procedure or instruction, is copied from another requirement, or describes future work under In Place Warning

Cortex on a P2PE assessment

Cortex reads the P2PE assessment as its P-ROV does: a requirement’s text and testing procedures with their reporting instructions and the component types each applies to, your findings and responses, the Summary of Findings, the report details, the P-AOV as filled, and the export checks. It names requirements as the P-ROV prints them. Cortex does not save P2PE answers: ask it to draft a response and it writes the draft in its reply, for you to review and paste. The finding is always yours.